For simpler monitoring, it’s possible to install a remotely accessible network device, allowing real-time monitoring of your solar park’s productivity and various network parameters.
If necessary, we conduct fault detection and troubleshooting.
Contact us if you need maintenance, a contract, or in case of an emergency:
Monitoring provides insight into when and what productivity is, allowing you to shape your energy consumption accordingly. Additionally, it’s possible to see both productivity and overall consumption when using the phase measurement option.
As a rule, there is a habit of monitoring energy consumption to adjust consumption according to the current productivity of the panels.
We install an additional device, Modbus R2, to your inverter.
If the heat pump supports SG Ready functionality, it is possible to use the second relay to also use domestic hot water and heating as an “battery”, and to store excess cheap electricity as heat. Such interfaces are available, for example, on Nibe, Thermia, Daikin, Fujitsu, Atlantic, Mitshubishi, Panasonic*, and many other heat pump models. When the batteries are full and electricity is sufficiently cheap, we can use heat pumps with SG Ready interfaces to raise, for example, the hot water temperature by 5 degrees. Raising the temperature of a 200-liter boiler by 5 degrees stores 1.1 kWh of energy in the water.
In addition to heat pumps, it is possible to control many different electrical devices – air conditioners, electric boilers, electric boilers for accumulator tanks, pools, etc. Raising the temperature by 10 degrees on a 1000 m3 accumulator tank stores 11 kWh of energy. Raising the temperature by just 1 degree on a 36 m3 pool stores 40 kWh of energy.
If desired, we also conclude a maintenance agreement, under which we maintain and deal with park maintenance and overall condition assessment.
Copyright © Division Red OÜ | Email: info@dred.ee | Phone: + 372 5880 6686 | Supported by: VLA